“La Planicie” Project
Peru
Datos del Proyecto
Business Area:
Business Subarea:
Activity:
Cost: $18,050,780.74
Country: Peru
Características del Proyecto
The La Planicie - Industriales 220 kV project involved a complementary transfer system that links to two substations with different operators:
• SE Industriales 220/60 kV operated by Luz del Sur
• SE La Planicie 220 kV operated by ISA REP
The EPC La Planicie - Industriales project in a double 220 kV circuit with an underground section was integrated through the following phases:
• Design and engineering of the underground power line
• Supply of insulated XLPE-type cable
• Construction of civil works
• XLPE cable assembly and accessories
• Testing and commissioning
• Training on installation, operation and maintenance