225kV Overhead Evacuation Line in Ouarzazate
The project forms part of the 225 kV overhead evacuation line of the Ouarzazate Solar Thermal Power Station.
DetailsThe project forms part of the 225 kV overhead evacuation line of the Ouarzazate Solar Thermal Power Station.
DetailsThe project forms part of the 225 kV overhead evacuation line of the Ouarzazate Solar Thermal Power Station.
DetailsCivil works for construction, supply and electromechanical assembly of equipment, for the connection and metering station of the Ismael Cortinas – ICO TJV.
DetailsReinforcing, hoisting and laying of four sections in the 400kV Mezquita/Mudejar-Morella transmission line. One section with a double triplex circuit and three sections with a quadruple triplex circuit.
DetailsThe scope of THE WORK includes the construction of the San Diego de Cabrutica, Pariaguán and Tigre I Nueva substations.
DetailsThe Cruce de Cabral project involves the construction and expansion of 3 Electrical Substations located in the Southern Zone of the Dominican Republic.
DetailsThe La Planicie – Industriales 220 kV project involved a complementary transfer system that links to two substations with different operators and a double 220 kV circuit with an underground section.
DetailsDesign, supply and assembly of the 225 kV Dual Power line – OMVS (Nouakchott) and associated electrical substations.
DetailsThe project involved design engineering, the supply of materials and construction of the modifications of the 66 kV lines of the OCP Jorf industrial plant.
Details