225kV Overhead Evacuation Line in Ouarzazate
The project forms part of the 225 kV overhead evacuation line of the Ouarzazate Solar Thermal Power Station.
DetailsThe project forms part of the 225 kV overhead evacuation line of the Ouarzazate Solar Thermal Power Station.
DetailsThe project forms part of the 225 kV overhead evacuation line of the Ouarzazate Solar Thermal Power Station.
DetailsReinforcing, hoisting and laying of four sections in the 400kV Mezquita/Mudejar-Morella transmission line. One section with a double triplex circuit and three sections with a quadruple triplex circuit.
DetailsThe La Planicie – Industriales 220 kV project involved a complementary transfer system that links to two substations with different operators and a double 220 kV circuit with an underground section.
DetailsDesign, supply and assembly of the 225 kV Dual Power line – OMVS (Nouakchott) and associated electrical substations.
DetailsThe project involved design engineering, the supply of materials and construction of the modifications of the 66 kV lines of the OCP Jorf industrial plant.
DetailsElectricity distribution tower and conductor changes works in Seine et Marne – Ile de France.
DetailsIncrease in Capacity of the line from 197 MVA to 260 MVA from S/E Maitencillo (Vallenar), until S/E Cardónes (Copiapó) in Chile.
DetailsCONSTRUCTION OF 2 SUBSTATIONS AND A TRANSMISSION LINE IN URUGUAY